Jing Feng Hotel
Jing Feng Hotel locates in NO.61 of Fourth Circle south road of Fengtai district with 108000 square meters including 48000 square meters hotel with 1200 beds in 600 guest rooms,8000 square meters auditorium and 52000 square meters dormitory and office. Ever Source geothermal energy heating pump system with regenerative energy is applied into main building and hall with 56000 square meters including 33000 square meters of air-conditioning area.
With application of shallow geothermal energy cooling and heating system, Jing Feng Hotel utilizes regenerative energy as alternative cooling and heating source for cooling in summer, heating in winter and daily hot water supply. Three fourth of buildings cooling and heating source is shallow geothermal energy. The system features in environment protection, energy saving, low operation cost and water source protection. 75%of energy utilized is collected from underground .In this way, energy utilization quality is increased in order to set up solid basis for green buildings. Compared with traditional cooling and heating source, Ever Source geothermal energy heating pump (central liquid cooling and heating source environment system) saves more energy to make He Li Shi Control and Automotive Industry Base operate without any pollution.
Jing Feng Hotel
Control and Automotive Industry Base of Beijing He Li Shi System Engineering Development Company Limited
Control and Automotive Industry Base of Beijing He Li Shi System Engineering Development Company limited locates in YiZhuang Economic Technological Development Area. The base is modernized production center with six buildings in 8301 square meter new built area. The project is constructed to reach middle and long term energy-saving standard in national construction plan and 65% of three-period standard. Regenerative energy source utilization rate is 50% higher than target. Major energy-saving methods applied in constructions including:
1 Air-tightness of gray LOW-E6mm outer windows and doors is 鈪 grade and heat-insulating property reaches 鈪 grade.
2 Broken bridge constructions are fully considered into design of nodes of outer walls and roofing. All of outer windows are made with duralumin mullion.
3 Outer wall is built with 300mm B05 concrete, pitched roof with 80mm benzene board, flat roof with 60mm extruded benzene board and beam, pillar and lintel with 50mm extruded benzene board.
With application of shallow geothermal energy cooling and heating system, He Li Shi Control and Automotive Industry Base Project utilizes regenerative energy as alternative cooling and heating source for cooling in summer, heating in winter and daily hot water supply. Three fourth of buildings cooling and heating source is shallow geothermal energy. In this way, energy utilization quality is increased to set up solid basis for green buildings. Compared with traditional cooling and heating source, Ever Source geothermal energy heating pump (central liquid cooling and heating source environment system) saves more energy to make He Li Shi Control and Automotive Industry Base operate without any pollution.
Control and Automotive Industry Base of Beijing He Li Shi
System Engineering Development Company Limited
Beijing Ai Pu Yi Biological Technology Development Company Limited.
Gene Chip Equipment and Medical Testing center in Beijing Ai Pu Sheng Biological Technology Development Company Limited Scientific Research building locates in Yizhuang economic development area. The new built area is 18690 square meters, first-period construction area is 18690.88 square meters including 4629.23 square meters public office area, 5859.4 square meters production factory, 5303.31 square meters testing center and 3134.94 square meters GMP factory all with five layers. The project is constructed to reach middle and long term energy-saving standard in national construction plan and 65% of three-period standard. Regenerative energy source utilization rate is 50% higher than target. Major energy-saving methods applied in constructions including:
1 Air-tightness of gray LOW-E6mm outer windows and doors is 鈪 grade and heat-insulating property reaches 鈪 grade.
2 Broken bridge construction is fully considered into design of nodes of outer walls and roofing. All of outer windows are made with duralumin mullion.
3 Outer wall is built with 300mm B05 concrete, pitched roof with 80mm benzene board, flat roof with 60mm extruded benzene board and beam, pillar and lintel with 50mm extruded benzene board.
Compared with traditional cooling and heating source, Ever Source geothermal energy heating pump (central liquid cooling and heating source environment system) saves more energy to make Gene Chip Equipments and Medical Testing Center operate without any pollution.